Putrajaya
View
Bandar
Botanic Parcel A, Klang, Selangor View
Kuala Lipis
Teachers’ Quarters Project, Pahang View
Bandar
Raub, Pahang View
Sg. Sekilau,
Pahang View
USJ School,
Selangor View
Glenmarie
Cove, Klang, Selangor View
Shah Alam
2, Shah Alam, Selangor View
Apartment
Pelajar Uniten, Selangor View
University
of Nottingham, Selangor View
Waller
Court Apartments, Ipoh, Perak View
Precinct
14-7, Putrajaya View
Putrajaya
|
Location of CDS
units
Precint 3 & 4, Putrajaya.
Client Requirement
Putrajaya Holding emphasizes the preservation of its eco-system.
Surrounding by lakes, the development of Putrajaya must
provide a defense for the lake and most effective in trapping
the pollutants. CDS units were selected by being aesthetically
appealing.
Application
Stormwater pollution control trap
Emptying method
Vacuum suction truck
Size of CDS unit
Ranges from P1009 to P1015 with 32 units installed.
Top
|
Bandar
Botanic Parcel A, Klang, Selangor
|
Location of CDS
units
Bandar Botanic, Kelang, Selangor..
Client Requirement
The Bandar Botanic development emphasizes on the serenity
of its surrounding. There are several man-made lakes around
the development with 18 drainage outlet to the lake in
phase 1 itself.
Application
Stormwater pollution control trap
Catchment Area
In total there are 18 unit with catchment area ranging
from 3.14 ha to 19.1 ha.
Design flow treated and ARI event equivalent
From 0.04 to 0.75 cumecs
Emptying method
Litter basket.
Size of CDS unit
Twin unit F0908 and 17 single units of F0908 and F0912
Top
|
Kuala
Lipis Teachers’ Quarters Project, Pahang
|
Location of CDS
units
Kuala Lipis Teachers’ Quarters
Pahang..
Client Requirement
The client requires a gross pollutant trap that is easy
to maintain. This is essential as the site being rural
area, does not have the facility of a vacuum truck.
Application
Stormwater pollution control trap
Catchment Area
10 ha
Design flow treated and ARI event equivalent
3 m³/s
Emptying method
Litter basket. System comes with lifting hoist with monorail.
Size of CDS unit
Twin unit F0908
|

|

Access ladder going down to the CDS unit for inspection
|
Top
|
Bandar
Raub, Pahang
|
No information
available at the moment |
|
Sg.
Sekilau, Pahang
|
|
Location of CDS units
Sungai Sekilau, Kuantan, Pahang
Client Requirement
A pioneer project by the Drainage And Irrigation Department
to control pollutant from Sungai Sekilau. Due to unavailability
of vacuum truck, CDS offers the only alternative to an
easy and cost effective maintenance using lifting basket
method for quick removal of trapped pollutant.
Application
Stormwater pollution control trap
Catchment Area
Creek / Small river.
Design flow treated and ARI event equivalent
3 m³/s
Emptying method
Litter basket.
Size of CDS unit
P1512
Top
|
USJ
School, Selangor
|
No information
available at the moment |
Top
Glenmarie
Cove, Klang, Selangor
|
Location of CDS Unit
By the lake next to new club house of a very exclusive
development
Client Requirement
To control and minimize sediment and pollutant
discharge into the lake from adjacent main road and park
activity areas
Application
Stormwater pollutant control trap
Catchment
1 ha
Design Flow Treated and ARI Event Equivalent
0.02 m3/s
Capturing Method
Litter basket
CDS Model
F0908
|
|
Top |
Shah
Alam 2, Shah Alam, Selangor
|
Location of CDS Unit
Outlet discharging to next water source
Client Requirement
To remove at least 95% gross pollutant before discharging
to lake and must be constructed within a 12 meter right
of way
Application
Stormwater pollutant control trap
Catchment
175 ha
Design Flow Treated and ARI Event Equivalent
2.5 m3/s
Capturing Method
Litter basket
CDS Model
P2028
|
|
Top |
Apartment
Pelajar Uniten, Selangor
|
Location of CDS Unit
UNITEN, Jalan Serdang, Kajang, Selangor Darul Ehsan
Client Requirement
To remove all gross pollutant before discharge
into onsite detention tank. The stormwater runoff use being
harvested and treated is re-use for irrigation
Application
Stormwater pollutant control trap
Catchment
1.8 ha
Design Flow Treated and ARI Event Equivalent
0.306 m3/s
Capturing Method
Litter basket
CDS Model
2 no. P1015
|
|
Top |
University
of Nottingham, Selangor
|
Location of CDS Unit
University of Nottingham, Semenyih, Selangor Darul
Ehsan.
Client Requirement
This University campus would like to create a harmony
and natural environment around the campus with a man-make
lake located at the centre of the campus with 3 drainage
outlets to the lake.
Application
Stormwater pollutant control trap
Catchment
12.43 ha
Design Flow Treated and ARI Event Equivalent
From 0.24 m3/s - 0.98 m3/s
Capturing Method
Litter basket
CDS Model
2 x P1015 and P2018
|
|
Top |
Waller
Court Apartments, Ipoh, Perak
|
Location of CDS Unit
Outlet discharging to Sungai Kinta.
Client Requirement
To control and minimize sediments and pollutants
discharged into Sungai Kinta from the adjacent residential
areas.
Application
Stormwater pollution control trap
Catchment
4.84 ha
Design Flow Treated and ARI Event Equivalent
0.51 m3/s
Capturing Method
Litter basket
CDS Model
P1009 |
|
Top |
Precinct
14-7, Putrajaya
|
Location of CDS Unit
Outlet discharging to the retention pond.
Client Requirement
Putrajaya Holding emphasizes the preservation of
its eco-system. Surrounded by lakes, the development of
Putrajaya must provide a defense for the lake and most effective
solution in trapping the pollutants. CDS units were selected
also due to being aesthetically appealing.
Application
Stormwater pollution control trap
Catchment
28 ha
Design Flow Treated and ARI Event Equivalent
3.3 m3/s
Capturing Method
Vacuum Suction Tank
CDS Model
P2028 |
|
Top |
| |
|